Roadtrippin' Colorado Style

Exit 146 - Garden of the Gods Road  aerial picture

This interchange was completely redone back in the mid to late 80's. Even then, the engineers were smart enough to make an interchange that is easy to expand. All that needs to happen here is to pave the median and install a Jersey barrier. (And hopefully a new coat of paint on the bridge...) Interesting side note: this is Colorado Springs's first and only SPUI. To make it easier on the drivers, green lights were imbedded in the pavement which would light up to guide left-turning drivers. Unfortunately, they didn't work much past the first snowstorm and were removed in a resurfacing project in 2004.

Live camera courtesy springsgov.com

Original pictures - taken April 2005

  • Garden of the Gods Bridge
    Original shot

    Northbound over Garden of the Gods.

  • The bluff
    Original shot

    Bluff overlooking 25 after Garden of the Gods. We're heading northbound.

  • Towards GOG
    Original shot

    Here's the same bluff while traveling southbound.

  • Over GOG
    Original shot

    Southbound over Garden of the Gods.

  • GOG SPUI
    Original shot

    Northbound offramp at Garden of the Gods. Apparently we need 6 red arrows per offramp!

  • GOG Eastbound
    Original shot

    Eastbound approaching 25.

2006 Construction Pictures

2005 Construction Pictures: newest to oldest

  • 12220518
    12/22/05

    Rockrimmon Constructors wishes you a happy holiday season. Yes, this lights up at night.

  • 12220586
    12/22/05

    More cement has been poured for the NB onramp.

  • 12090541
    12/09/05

    The conduit for the new traffic signals have been run. The new signals will be where the cones are in the GoG median.

  • 11290501
    11/29/05

    I caught crews installing new traffic signals today.

  • 11290502
    11/29/05

    The new signals will regulate right-turning traffic from the southbound offramp.

  • 11290530
    11/29/05

    Approaching the median construction zone traveling westbound on GoG.

  • 11290503
    11/29/05

    Here's a rare sighting of a keep left sign. This is the onramp to NB I-25.

  • 11290531
    11/29/05

    New cement for the NB onramp goes right down to the old asphalt.

  • 11290504
    11/29/05

    On the NB onramp now. This used to be 2 lanes wide; it will be 3 when it's complete.

  • 11290505
    11/29/05

    This Yield sign doesn't lie. There's no accel lane on the interstate right now. The backups here are quite high usually.

  • 11290507
    11/29/05

    See? Told you there's no accel lane!

  • 11290508
    11/29/05

    A bit of the new cement is poured here.

  • 11290510
    11/29/05

    I caught the cement crews in mid-pour today.

  • 11290556
    11/29/05

    The cement is all but ready in the median as well. Looking SB.

  • 11290558
    11/29/05

    There's just some scoring of the cement left here.

  • 11150504
    11/15/05

    Continuing work on the new onramp and mainline lanes.

  • 11150505
    11/15/05

    This car is sporting one of the last remnants of last night's snowstorm. Man, I love Colroado weather.

  • 11150506
    11/15/05

    The smaller cement layer isn't working today since it's only 30 degrees at the time this pic was taken.

  • 11150519
    11/15/05

    A shot of the smaller cement layer from the SB lanes.

  • 11150528
    11/15/05

    I guess they're serious about no pedestrians on the north side of Garden of the Gods Road!

  • 11080513
    11/8/05

    Covered new cement north of the interchange

  • 11080514
    11/8/05

    This worker is cutting pressure relief joints in the cement.

  • 11080515
    11/8/05

    The cement layer is waiting for its next assignment.

  • 11080516
    11/8/05

    Crews are working away on the GoG bridge.

  • 11080517
    11/8/05

    A smaller cement spreader was brought in for the gap between the new cement and the old SB lanes.

  • 11080533
    11/8/05

    Onramp reconstruction continues.

  • 11010508 title=
    11/1/05

    Crews are finishing up the first pour of the new cement lanes.

  • 11010509
    11/1/05

    Working at the new lanes just after the GOG merge northbound.

  • 11010528
    11/1/05

    Approaching the GoG exit southbound. Crews are watching the cement dry. (Is this as much fun as watching paint dry?)

  • 11010529
    11/1/05

    A look at the finishing touches on pass 1 of the cement roadbed

  • 11010538
    11/1/05

    The barrel gap has been closed, not that any cars could get past the parked crew trucks.

  • 11010540
    11/1/05

    This onramp used to be two lanes wide. The final configuration will see three lanes. This is a quite busy interchange.

  • 10270508
    10/27/05

    The concrete installer is ready to go north of GoG.

  • 10270509
    10/27/05

    This truck demonstrates how much wider the ROW of this stretch of the interstate is.

  • 10270524
    10/27/05

    As predicted, traffic backups are quite large to access NB 25 here.

  • 10270525
    10/27/05

    Definitely making sure drivers know the leftmost left turn lane is closed.

  • 10270545
    10/27/05

    Crews are either rewiring the VMS or in the process of removing it here: I can't tell.

  • 10270546
    10/27/05

    A shot of the concrete machinery from SB 25.

  • 10270547
    10/27/05

    A shot of the completed soundwall from the GoG merge area.

  • 10270556
    10/27/05

    Westbound GoG. The crews should really close that gap between the barrels...

  • 10270557
    10/27/05

    ...since there's no onramp there anymore. This confuses quite a few drivers.

  • 10270558
    10/27/05

    Here's the temporary onramp. It goes right over the median.

  • 10200528
    10/20/05

    Just after the SB GOG merge.

  • 10180515
    10/18/05

    Traffic like this makes me wonder if three lanes will be enough.

  • 10180530
    10/18/05

    The VMS says the leftmost left turn lane will close on 10/23/05. This'll cause severe backups through here.

  • 10180531
    10/18/05

    The NB onramp is already undergoing a facelift.

  • 10180532
    10/18/05

    Technically, there's three lanes here. Or the crazy driver to my right seems to believe that.

  • 10130509
    10/13/05

    At the GOG merge, crews are working right up to the temporary barriers.

  • 10130510
    10/13/05

    Dirt storage has moved closer to the road. This makes for a very narrow, crowded journey.

  • 10130511
    10/13/05

    Lots of activity to the east of the NB lanes today.

  • 10050511
    10/5/05

    The fully paved median extends further south than before.

  • 10050512
    10/5/05

    Because of the bluff, the interstate is getting widened on the east side as well north of GOG.

  • 09260541
    9/26/05

    Looks like the median is used for toy storage this week.

  • 09260542
    9/26/05

    More toys on the bridge.

  • 09260543
    9/26/05

    While stopped in traffic, I thought I'd take this shot of the bridge's expansioin joint.

  • 09260544
    9/26/05

    The last toy parked in the median.

  • 09260525
    9/26/05

    Old drainage pipes awaiting their ride out of the site. Looking south on I-25.

  • 09260526
    9/26/05

    The median is awaiting resurfacing south of the interchange.

  • 09260527
    9/26/05

    Approaching the sound wall installation section, which is continued on the Ellston Road Page.

  • 09190514
    >9/19/05

    Crews wasted no time in clearing this section of the median.

  • 09190515
    9/19/05

    Looking at the graded and prepped median.

  • 09190516
    9/19/05

    A look at the depth of the grading. The tire tracks are at the bottom of the graded area.

  • 09190517
    9/19/05

    If you look closely, you can see wires hanging off of the control box. The big VMS has been disconnected.

  • 09120510
    9/12/05

    Looking northbound from the GOG bridge.

  • 09120511 title=
    9/12/05

    The northbound acceleration lane is too short. This was even mentioned in our paper's "Street Smarts" section.

  • 09120512
    9/12/05

    You can see archaeological students from UCCS studying these rocks quite often.

  • 09120520
    9/12/05

    This pile of dirt will require the first overnight interstate closure of the COSMIX project for removal.

  • 09120521
    9/12/05

    Bridge work ahead! MM 145.5 is at the Ellston bridge. COSMIX has been using MM xxx for all of its VMS announcements.

  • 08290505
    8/29/05

    The median work is about to start north of the Garden of the Gods interchange.

  • 08290506
    8/29/05

    Southbound lanes are restriped here now in anticipation of median work.

  • 08290507
    8/29/05

    Before, during the morning, traffic used to back up on the shoulder for this exit. I'd hate to see where it goes now.

  • 07190503
    7/19/05

    Approaching the Garden of the Gods bridge. Here's where the first zone starts.

  • 07190504
    7/19/05

    Construction crews are using the paved wide shoulder as parking for their personal vehicles.

  • 07190505
    >7/19/05

    Just after the bridge structure lies a few piles of the removed asphalt, ground up fine and awaiting removal.

  • 07190506
    7/19/05

    Crews remove the old asphalt on a section just south of Garden of the Gods Road.

2006 Construction Pictures

Section Links

Disclaimer: This website is not affiliated with the COSMIX Project or the Colorado Department of Transportation. All pictures contained on this site are solely the property of Ryan Wanner unless otherwise specified. Copying/distributing these pictures without my authorization is going to put me in a pretty bad mood, and you don't want to see that, trust me. Linking to this site is more than welcome, but let me know so that I can return the favor. That is all, have a good day, k?--Ryan